From 6 to 21 November, I was on the road for business the whole time: Qingdao, Anqing, Guangzhou and Seoul. I didn’t go into the office once.
I’m the main lead on several projects at the same time. I thought I had a decent system for keeping them all moving. That stretch showed me my system had a hidden condition: it assumed I would be back at my desk soon.
This is what I learned about managing multiple projects while travelling, and the three rules I’m setting for myself from now on. It’s a note on self-management, not a complaint. If you lead more than one project and your calendar is filling up with trips, it might save you some trouble.
Sixteen Days, Four Cities, Zero Office Days
A little context first. I’ve worked in the pet food industry since 2023, on the business side. I’m the general manager of a company in the Netherlands and head an overseas brand unit, and I recently took over a Korean brand, which is why Seoul was on the list. I’m based in China, and my work already crosses many markets. Travel comes with the job.
I want to be fair to travel, because it is genuinely valuable. You see a market with your own eyes. You sit across the table from partners. You notice things that never make it into a report.
But this trip was different in one way: it was continuous. There was no day in the middle when I went back to the office, looked at everything at once, and picked up the threads.
What Broke When I Managed Projects From the Road
Many of my usual work-management methods and project-management tools stopped being usable. I hadn’t noticed how much of my routine quietly depends on being in one place. Think of the routines that depend on being at my desk, the face-to-face check-ins, and the moments when I can see at a glance which project needs me today.
When those went away, some projects were at risk of stalling.
Nobody did anything wrong. The problem was structural. My way of working was built for a leader who comes back to the office. Take the office away for long enough, and the person who holds the threads is in a different city, on a different schedule, with less room to think.
Insight Box: As the main lead on several projects, I’m often the place where information meets and decisions get made. When I’m on the move, that meeting point moves with me, and it isn’t always easy to reach. The longer the trip, the more the projects wait at that point.
I’m not the only one who finds long stretches of travel hard. Researchers at Columbia University and the City University of New York studied more than 18,000 employees. They found that people who travelled for business two weeks or more a month reported more symptoms of anxiety and depression than those who travelled one to six nights a month. They also reported more trouble sleeping. It’s an association, not proof that travel causes these problems. But it’s a good reason to take the length of a trip seriously.
Rule 1: Don’t Travel Continuously for More Than 15 Days
Why: As the main lead of multiple projects, I’ve learned that more than 15 days of continuous travel really does affect project progress. Projects need a rhythm of review, decisions and follow-up. On a long trip, that rhythm slips, one day at a time.
How: I’ll treat 15 days as an upper limit when I plan trips. If an itinerary runs longer, I have two choices. I can break it up with a return to the office, or I can ask whether every stop really has to happen in this trip.
A question worth asking before you book: Which of my projects would go the longest without me looking at it properly? If the honest answer is “most of the trip”, the trip is too long, or it needs Rule 2.
Insight Box: The exact number matters less than having one. Fifteen days is my line because that’s where I saw the effect on my own projects. Your line might be shorter or longer, depending on how many projects you lead and how much they depend on you.
Rule 2: If Long Travel Is Necessary, Name a Project Deputy
Why: Sometimes a long trip can’t be avoided. In that case, the timeline needs someone close to it. If every next step waits for my reply from the road, the timeline will move only as fast as my travel day allows.
How: A project deputy is one named person who is responsible for keeping the timeline on track while I’m away. It isn’t a vague “the team will handle it”. The deputy needs:
- the timeline and the milestones that fall during the trip;
- what “on track” looks like for each one;
- the decisions they can make without me;
- the issues that should reach me straight away.
The hardest part, for me, is the third point. Handing over decision rights is uncomfortable when you’re used to being the main lead. But a deputy without decision rights is only a messenger, and a messenger can’t keep a timeline moving.
I came to a similar conclusion when I wrote about working with an AI team: clear checkpoints in plain words do more than long instructions. The same is true with people. A deputy can only work with what you actually hand over.
Insight Box: Naming a deputy isn’t a sign that you’re less committed to the project. It’s a sign that you care more about the project than about being the person every decision passes through.
Rule 3: Protect Rest, Then Add Extra Working Time
Why: Travel takes time that the office never asked for: getting from place to place, adjusting, waiting. The daily work doesn’t pause because I’m away. To keep up with it, I need two things during continuous travel: enough rest, and extra working time.
The order matters. Without enough rest, extra hours turn into slow, tired hours, and tired decisions are rarely good ones.
How: I’ll put rest into the travel plan on purpose, instead of hoping it appears. Then I’ll block a fixed daily window for the work that doesn’t stop when I travel, such as replies, reviews and approvals.
Ask yourself each morning on the road: When today will I actually do the work that doesn’t stop because I’m away? If there’s no answer, the work will happen late, rushed or not at all.
A Pre-Travel Checklist for Leading Multiple Projects
Before my next long trip, I plan to go through this list. It takes very little time compared with a stalled project.
- Deputy named. One person for each project that can’t wait, and they know it directly from me.
- Timeline handed over. The milestones during the trip, and what “on track” means for each.
- Decision rights agreed. What the deputy decides, what can wait, and what needs me.
- Check-in rhythm set. A short, fixed check-in that still works across time zones and busy travel days.
- Work blocks protected. A daily window in the calendar for the work that doesn’t stop.
- Rest planned. Sleep and recovery time written into the plan, not left to chance.
- Return date fixed. Back in the office within 15 days, or Rule 2 applies in full.
Travel Is Part of the Job. Stalling Doesn’t Have to Be.
I’ll keep travelling. For someone who works across markets, seeing things first-hand is part of the work, and some of the most useful conversations happen face to face.
What I’m changing is how I travel. Before, I treated a long trip as something my projects would simply absorb. Now I see it as a change in how the projects are run, and that change needs planning, just like a launch or a handover. Fifteen days taught me that the real test of a project system isn’t how it runs when I’m in the office. It’s how it runs when I’m not.
Takeaway:
- If you lead multiple projects, set a limit on continuous travel. Mine is 15 days, because beyond that I saw project progress suffer.
- If a longer trip is necessary, name a project deputy and hand over the timeline and real decision rights.
- On the road, plan rest first, then add extra working time for the work that doesn’t stop.
What do you think? If you left the office for 15 days starting tomorrow, which of your projects would slow down first, and who would keep it moving?
References:
- Rundle, A. G., Revenson, T. A., & Friedman, M. “Business Travel and Behavioral and Mental Health.” Journal of Occupational and Environmental Medicine (published online December 2017). https://doi.org/10.1097/JOM.0000000000001262
- Columbia University Mailman School of Public Health, “Feel Anxious? Have Trouble Sleeping? You May Be Travelling for Business Too Often” (8 January 2018): https://www.publichealth.columbia.edu/news/feel-anxious-have-trouble-sleeping-you-may-be-travelling-business-too-often